Deck Refurbishment and Anti-Skid Renewal
- DECK REFURBISHMENT INCLUDING ANTI-SKID RENEWAL
- MARINE
Summary
WJ Marine undertook a challenging full deck refurbishment project at Remontowa Shipyard in Gdansk, Poland. Despite freezing conditions and snowfall, the team successfully completed the works, including captive blasting, painting, and anti-skid renewal. The project spanned 14 days and covered a total area of 4,700sqm. The works were signed off by an independent paint inspector, ensuring high-quality results.
Objectives
The main objective of the project was to fully refurbish the ship’s deck, renew the anti-skid surfaces, and provide long-lasting protection. WJ Marine aimed to complete the works within the 14-day timeframe, adhering to stringent quality standards. The goal was to deliver a safe and functional deck surface despite the challenging winter conditions.
Solutions
WJ Marine implemented innovative solutions to overcome the harsh winter conditions. Special measures were taken to keep the products warm and encapsulated, ensuring that the applications met specifications. The team’s expertise and knowledge of surfacing played a crucial role in executing the project safely and efficiently.
Results
WJ Marine successfully completed the full deck refurbishment project at Remontowa Shipyard. The team’s perseverance and hard work, along with their ability to work in challenging conditions, resulted in outstanding results. The deck was fully refurbished, anti-skid surfaces were renewed, and the protective painting applications were applied. The project was completed within the specified timeframe, meeting all quality standards and achieving a safe and functional deck surface.